Each machine is assembled and tested step by step to ensure mechanical integrity and operational precision.
Electrical Testing – Verification of wiring, PLC logic, HMI responsiveness, and sensor calibration.
Mechanical Testing – Alignment of filling valves, sealing performance of capping units, and conveyor synchronization.
Leak & Pressure Tests – Simulated filling operations confirm no leaks, drips, or overflows under different production pressures.
Safety Checks – Guard interlocks, emergency stop switches, and operator safety shields are validated for compliance.
Performance Simulation – Trial runs are conducted with bottles, caps, and labels to replicate actual production before shipment.