You are here: Home » News » PET Bottled Water Production Line in Guinea: 4,000–5,000 BPH Turnkey Engineering Project

PET Bottled Water Production Line in Guinea: 4,000–5,000 BPH Turnkey Engineering Project

Views: 0     Author: Site Editor     Publish Time: 2026-09-10      Origin: Site

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

The engineering performance of a PET bottled water production line is determined by the interaction of water preparation, container production, primary packaging, bottle transfer, labeling, secondary packaging, utilities and line controls.

Nancheng Machinery's bottled-water project in Guinea, West Africa, was developed around this complete production concept.

The plant mainly handles 500 ml PET drinking-water bottles with a designed output of approximately 4,000–5,000 bottles per hour, commonly expressed as BPH. The confirmed equipment scope includes RO water treatment, automatic PET bottle blowing, rinsing-filling-capping, bottle conveying, automatic labeling and heat-shrink packaging.

The machinery has been installed and commissioned at the customer site. Local technicians have also received practical equipment training, and finished packaged bottled water is being produced inside the factory.

For engineering purposes, the filling machine is treated as one node in the production system rather than the sole capacity reference. Stable output requires sufficient treated water, qualified PET bottles, caps, labels and packaging materials, together with utilities capable of supporting simultaneous machine operation.

The project therefore provides a useful technical reference for investors planning a medium-scale PET bottled water production line in Guinea, West Africa or similar overseas markets.

Guinea Project Design Data and Equipment Scope

The confirmed primary package for the project is a 500 ml PET bottle.

The documented production system includes the major equipment required between water treatment and finished shrink-wrapped packs. Product-contact components are specified in SUS304 stainless steel, while the equipment was configured for the local power supply and workshop environment.

Confirmed Guinea Project Configuration

Project Parameter

Confirmed Data

Location

Guinea, West Africa

Product

Bottled drinking water

Primary Bottle

500 ml PET

Designed Line Output

4,000–5,000 BPH

Water Preparation

RO water-treatment system

Bottle Production

Automatic PET bottle blowing

Primary Packaging

Rinsing-filling-capping monoblock

Bottle Transfer

Conveyor system

Labeling

Automatic labeling machine

Secondary Packaging

Heat-shrink wrapping

Product-Contact Material

SUS304 stainless steel

Current Status

Installed, commissioned and operating

The available project record does not specify the RO production rate in cubic meters per hour, individual equipment model numbers, compressor capacity or measured line efficiency. These values are therefore not estimated as project facts.

The documented project service scope includes plant layout design, equipment manufacturing, sea freight, on-site installation and commissioning, local operator training and warranty-period after-sales support.

Engineering Throughput Derived From the Confirmed Production Basis

The combination of 500 ml bottle volume and 4,000–5,000 BPH provides several useful engineering reference values.

These figures are calculated directly from the confirmed project basis. They are production-load calculations rather than additional equipment specifications.

Derived Production Load

Engineering Parameter

At 4,000 BPH

At 5,000 BPH

Bottles per Hour

4,000

5,000

Bottles per Minute

Approx. 66.7

Approx. 83.3

Net Water in Bottles

2.0 m³/h

2.5 m³/h

Bottles in an 8-Hour Rated Run

32,000

40,000

Net Bottled Water in an 8-Hour Rated Run

16 m³

20 m³

The 2.0–2.5 m³/h figure represents water physically contained in saleable 500 ml bottles at rated production.

It does not represent the required RO nameplate capacity.

The actual water treatment system must also account for the treatment process itself, operating schedule, storage strategy, startup conditions, cleaning-related demand and the required operating reserve.

The same distinction applies to the 32,000–40,000 bottles calculated for an eight-hour rated run. This represents theoretical production at uninterrupted rated throughput. Actual saleable shift output depends on stops, material replenishment, cleaning, operator activities, maintenance and downstream equipment availability.

This separation between rated capacity and operating output is essential when engineering a PET bottled water production line.

wiring layout drawing

Design Basis Development Before Equipment Finalization

The engineering design starts with the finished-product requirement rather than a machine catalogue.

For the Guinea project, the 500 ml PET bottle and 4,000–5,000 BPH production target establish the main packaging basis.

The water source establishes the process basis.

The factory dimensions and utility conditions establish the installation basis.

These three groups of information are then combined into one equipment and layout specification.

This method is consistent with Nancheng Machinery's complete beverage filling line layout guide, which treats package format, process demand, line capacity, utilities, maintenance access and finished-product logistics as connected engineering inputs rather than independent procurement items.

Core Engineering Design Basis

Design Input

Engineering Application

Raw-Water Analysis

Treatment-process selection

Finished-Water Specification

Treatment endpoint

500 ml Primary Bottle

Main packaging reference

Bottle Height and Diameter

Guides, conveyors and machine handling

Neck Finish

Blow mold, rinser, filler and capper interface

Bottle Weight

Blow molding and transfer stability

4,000–5,000 BPH Output

Capacity reference across the line

Operating Hours

Daily process and utility demand

Cap Specification

Closure feeding and capping setup

Label Specification

Labeling-machine configuration

Shrink-Pack Format

End-of-line capacity requirement

Factory Dimensions

Equipment and service layout

Electrical Supply

Electrical system configuration

Compressed-Air Availability

Blow molding and pneumatic design

Freezing equipment before these parameters are confirmed increases the probability of later mechanical change, utility modification or capacity mismatch.

power distribution layout

RO Water Treatment and Treated-Water Balance

The Guinea PET bottled water production line includes an RO water-treatment section upstream of the filler.

The treatment process begins with the raw-water analysis.

Pretreatment requirements depend on incoming water characteristics, while the RO section is selected according to the required treated-water condition and production demand. The project record confirms the use of RO but does not provide the detailed pretreatment sequence or membrane specification, so those elements should not be inferred as project facts.

From a capacity perspective, the confirmed 500 ml and 4,000–5,000 BPH basis creates a net packaged-water demand of approximately 2.0–2.5 m³/h.

The treatment system must support more than this net filling volume.

A complete design should account for usable treated-water production, operating losses, sanitation requirements, storage volume and replenishment rate.

Treated-Water Storage as a Hydraulic Buffer

A treated-water tank provides hydraulic separation between the relatively steady treatment section and the more stop-start behavior of the packaging line.

The filler may stop temporarily because of cap replenishment, bottle supply, labeling adjustments or downstream packaging conditions. The treatment process does not necessarily need to follow every short packaging interruption.

Correct storage design allows the water-production section to operate more steadily while maintaining sufficient product availability at the filler.

Storage volume should be calculated from the operating strategy. It should not be used to hide an undersized RO system.

For a PET bottled water production line, the relevant engineering relationship is net treatment output, hygienic storage capacity, replenishment rate and filler consumption under the same production schedule.

PET Bottle Blowing and Container Quality Control

The Guinea project uses an automatic PET bottle blowing machine to convert preforms into 500 ml bottles before filling.

The project documentation confirms that local operators received practical training in machine operation, pneumatic connections, parameter setting and basic maintenance after installation and commissioning.

At 4,000–5,000 BPH, the filling section requires approximately 67–83 qualified bottles every minute during rated production.

The engineering emphasis is on qualified bottle output, not theoretical blow-molding cycles.

Preform heating has to remain stable across the heating zone. Stretching and blowing conditions must maintain repeatable container geometry. Neck dimensions must remain compatible with downstream handling parts. Bottle-body rigidity must be sufficient for conveying, labeling and final packaging.

Variation generated in the blow molding section can appear later as a filling-line problem.

Unstable bottle dimensions can affect guide rails.

Neck variation can influence starwheel and transfer handling.

Poor body stability can affect filled-bottle conveying and label application.

Bottle blowing therefore forms part of the packaging-quality chain.

Compressed-Air Capacity as a Production Constraint

On-site PET bottle production moves part of the packaging process into the water factory and reduces dependence on transporting large volumes of empty bottles.

It also creates an important utility load.

The blow molding section requires a compressed-air system sized for the actual machine configuration. High-pressure blow air and lower-pressure pneumatic requirements should be considered separately according to the selected equipment.

The compressor package, air treatment, receiver capacity and distribution piping all affect usable air supply at the machine.

Pressure loss between the compressor room and the blow molding equipment also forms part of the design.

A blower with adequate rated output can still fail to provide 4,000–5,000 qualified bottles per hour if the supporting air system is insufficient.

For this reason, compressed-air design belongs in the PET bottled water production line capacity calculation rather than being treated only as a utility-room purchase.

Capacity Matching Across the Complete Production Chain

The production target of 4,000–5,000 BPH should be applied across all major sections of the line.

The objective is not identical nameplate speeds.

Different machines have different operating behavior, changeover requirements and short-stop characteristics. Selected sections may therefore require practical capacity margin.

The engineering objective is a balanced line in which no recurring upstream or downstream constraint consistently prevents the packaging section from achieving its intended operating rate.

Capacity and Interface Matrix

Section

Engineering Reference

Primary Failure Mode

Effect on Line

RO Treatment

Net treated-water availability

Insufficient supply

Product starvation

Treated-Water Storage

Buffer and replenishment

Low available volume

Filling interruption

PET Blowing

Qualified bottles/hour

Insufficient bottle supply

Filler starvation

Empty-Bottle Conveying

Stable transfer rate

Bottle instability

Irregular filler infeed

Filling

4,000–5,000 BPH basis

Product or bottle interruption

Primary output loss

Capping

Closure availability

Cap starvation

Filler/capper stop

Filled-Bottle Conveyor

Downstream transfer

Excess accumulation

Upstream stop

Labeling

Actual bottle throughput

Labeling interruption

Downstream bottleneck

Shrink Packaging

Actual pack throughput

Pack formation stop

Backpressure

Finished-Goods Removal

Continuous pack evacuation

Storage congestion

End-line blockage

At 5,000 BPH, approximately 83 bottles reach the downstream system every minute.

A downstream machine interruption lasting one minute can therefore create an accumulation demand of roughly 83 bottles, assuming the upstream equipment continues producing during that interval.

At 4,000 BPH, the equivalent one-minute quantity is approximately 67 bottles.

These values provide a practical basis for conveyor accumulation studies.

They do not mean that every buffer should be designed for exactly one minute. Actual accumulation length depends on bottle geometry, conveyor architecture, expected recovery time, control logic and available floor area.

Rinsing, Filling and Capping as an Integrated Wet-End Zone

The Guinea plant uses a rinsing-filling-capping monoblock.

PET bottles enter the machine from the upstream bottle-production section, pass through rinsing and water filling, receive caps and then discharge toward labeling and secondary packaging.

For engineering purposes, the monoblock should be evaluated through its interfaces.

The infeed must maintain a continuous supply of correctly oriented bottles.

The filling section requires stable product supply and suitable operating conditions.

The cap feeding system must deliver correctly oriented closures at the required consumption rate.

Bottle discharge must remain synchronized with the downstream conveyor.

Typical control requirements for this type of line include bottle-presence detection, cap-availability logic and upstream or downstream machine interlocks. The available project documentation does not state the exact Guinea control sequence, so these functions are presented as engineering design considerations rather than confirmed project specifications.

The automatic water filling machine therefore represents the central wet-end process, while its usable production output remains dependent on the surrounding systems.

9e30ee4f0377e01c6aa34ac978f3d2a0.png

Conveyor Design and Accumulation Control

Bottle conveyors provide both transport and controlled process buffering.

The two functions need to be considered separately.

Before filling, empty 500 ml PET bottles have low structural mass and are sensitive to unstable transfer. Neck handling, air conveying or equivalent bottle-transfer systems must maintain predictable container flow into the monoblock.

After filling, the bottle becomes heavier and mechanically more stable, but downstream interruptions introduce accumulation requirements.

Accumulation should be designed around a defined recovery period rather than an arbitrary conveyor length.

At the Guinea line's rated range, a 30-second downstream interruption corresponds to approximately 33–42 bottles. A 60-second interruption corresponds to approximately 67–83 bottles.

These calculations provide a useful starting point for buffer design, although the final conveyor arrangement must also consider container pitch, line pressure, transfer geometry, sensor positions and equipment response time.

The purpose of accumulation is controlled decoupling.

A short labeler adjustment can be absorbed without immediately stopping the filler. A longer interruption should trigger an orderly upstream stop before excessive bottle pressure develops.

Labeling Engineering Based on Actual Container Conditions

The Guinea project includes an automatic labeling section after filling and capping. Site documentation confirms operation of the labeler and associated bottle conveying system.

The labeling machine should be configured around actual 500 ml bottle dimensions rather than bottle volume alone.

Bottle diameter affects positioning and wrap geometry.

Bottle-wall rigidity influences container control.

Label material affects feeding and application technology.

Label length and bottle pitch influence the mechanical speed requirement.

At the upper production basis of 5,000 BPH, the labeler needs to process approximately 83 bottles per minute under rated line conditions.

Changeover requirements should also be incorporated when additional bottle formats are planned.

The resulting specification should identify format parts, adjustment points and expected changeover work before machine manufacturing is finalized.

Heat-Shrink Packaging and End-of-Line Capacity

The Guinea PET bottled water production line uses heat-shrink wrapping for secondary packaging.

The exact bottles-per-pack configuration is not stated in the available project documentation, so pack-per-minute output cannot be calculated as a confirmed project value.

The engineering method remains straightforward.

The required packer throughput is derived from bottle output and the selected pack count. The packer must then be evaluated for grouping stability, film handling, sealing, shrinking and finished-pack discharge.

The end-of-line section is particularly important because production interruptions here propagate upstream.

Once available bottle accumulation is consumed, the labeler must stop. Continued congestion subsequently affects filling.

Project photographs show local operators working around the heat-shrink packaging section and substantial quantities of finished bottled-water packs accumulated inside the workshop.

These images provide direct evidence that the production chain progressed through secondary packaging rather than stopping at the filler discharge.

Cross-Line Engineering for Layout and Utilities

Machine arrangement is only one layer of factory layout.

The production area must also support piping, cabling, compressed-air distribution, drainage, material replenishment, maintenance access and finished-product movement.

The Guinea equipment was configured with the local power supply and workshop environment in mind.

Cross-Line Utility and Infrastructure Requirements

Engineering Area

Required Design Data

Main Technical Impact

Electrical Supply

Voltage, frequency, phase, connected load

Drives and controls

Raw Water

Source flow and analysis

Treatment capacity

Treated Water

Available flow and storage

Filling stability

High-Pressure Air

Machine-specific flow and pressure

PET bottle production

Low-Pressure Air

Pneumatic demand

Valves and actuators

Cooling

Equipment heat-removal demand

Machine stability

Drainage

Location and discharge capacity

Cleaning and sanitation

Ventilation

Heat load and room condition

Utility and blower areas

Material Access

Preforms, caps, labels and film

Production continuity

Service Clearance

Machine-specific maintenance envelope

Maintainability

Finished-Goods Route

Pack evacuation and storage

End-line continuity

Utility demand should be calculated from the machines expected to operate simultaneously.

Using only the filler electrical load or filler capacity as the utility reference can underestimate total plant demand.

Sanitary Piping and Product-Side Engineering

The project documentation confirms SUS304 for water-contact components.

Product-side engineering also requires attention to pipe routing, drainability, valve access and hygienic connection between treated-water storage and the filling system.

The available source does not document the Guinea project's exact piping standard, CIP architecture or sanitary valve specification, so these details should remain outside the list of confirmed project facts.

For comparable PET bottled water production line projects, pipe routing should minimize unnecessary hold-up volume and provide practical access for inspection and maintenance.

Poorly positioned valves or pipework can make routine sanitation and service work more difficult even when the main equipment is correctly specified.

Layout review therefore includes both visible machinery and the utility and product-service systems around it.

New steel structure bottled water factory in Guinea

Control Architecture and Machine Coordination

Mechanical synchronization handles physical bottle transfer.

Control synchronization handles machine status.

The complete line requires defined behavior for bottle shortage, downstream accumulation, cap shortage, machine fault and restart conditions.

Typical integration includes machine-ready signals, bottle sensors, accumulation detection, upstream stop commands, downstream status and alarm indication.

The sequence should prevent a downstream fault from developing into uncontrolled bottle congestion.

Restart behavior also requires engineering attention.

Machines should return to production in a coordinated sequence rather than releasing accumulated bottles faster than downstream equipment can accept them.

For a 4,000–5,000 BPH PET bottled water production line, repeated short stops can create significant output loss even without a major mechanical breakdown. Stable interlocks and controlled restart logic therefore contribute directly to usable line efficiency.

Maintenance Engineering and Service Clearance

The external machine footprint does not represent the complete space requirement.

The operating envelope includes service doors, electrical panels, motor removal, pump maintenance, mold replacement, conveyor drives and operator access.

For the blowing section, mold removal space is especially relevant.

For the filling section, access around the carousel, capper and product connections affects maintenance time.

For conveyors, motors, sensors and wear components must remain accessible after adjacent equipment is installed.

An engineering layout should therefore be checked against the largest expected maintenance operation rather than only machine dimensions.

Space reserved for service work contributes directly to long-term equipment availability.

FAT, SAT and Commissioning as Separate Verification Stages

Factory Acceptance Testing, commonly abbreviated as FAT, and Site Acceptance Testing, commonly abbreviated as SAT, verify different operating conditions.

The available Guinea project record confirms installation, commissioning and operator training but does not provide a detailed FAT protocol.

FAT is therefore described here as a recommended engineering framework rather than a documented Guinea test record.

Technical Verification Framework

Stage

Engineering Verification

FAT

Mechanical functions, controls, sensors, alarms and agreed interfaces

Delivery Inspection

Equipment condition and shipment completeness

Installation

Leveling, alignment, piping, wiring and utilities

SAT

Operation with actual site utilities and production materials

Line Commissioning

Water supply, bottle transfer, filling, labeling and packing coordination

Operator Training

Startup, shutdown, adjustment and first-level maintenance

Handover

Routine production capability by the local team

SAT provides the first complete verification under the customer's actual electrical, compressed-air, water and workshop conditions.

Line commissioning then verifies interaction between the individual machines.

This includes bottle availability, filler infeed stability, cap supply, conveyor accumulation, labeler operation and final pack discharge.

Operator Training and Local Technical Capability

The Guinea project included practical training for local personnel after installation and commissioning.

The documented training on the automatic blow molding machine covered equipment operation, pneumatic connections, operating parameters and basic maintenance.

This training forms part of the technical handover.

Routine production requires local staff to manage startup, normal operation, visual inspection, basic adjustments and first-level alarm response.

Maintenance personnel also need familiarity with pneumatic components, sensors, wear parts and scheduled inspection points.

For an overseas water filling machine manufacturer, local operating capability reduces dependence on international service intervention for routine issues and improves recovery from minor production interruptions.

Verified Production Status at the Guinea Site

The Guinea project record extends beyond machine shipment and equipment positioning.

The installed system has been commissioned and placed into operation. PET preforms are converted into bottles, bottles are transferred through filling and capping, automatic labeling is operating, and finished bottled water proceeds through heat-shrink packaging.

The final project images show operators in the secondary-packaging area together with substantial quantities of completed bottled-water packs inside the workshop.

For this PET bottled water production line, the confirmed project evidence therefore consists of four engineering stages: completed installation, site commissioning, local operator training and finished-product production.

The project record does not provide measured OEE, sustained production-test duration or actual commercial shift output. Those values should only be published after they are supported by site production records.

Engineering Reasons for Selecting Nancheng Machinery

The technical value of Nancheng Machinery in a turnkey project lies in the integration scope rather than a single machine specification.

The Guinea project includes layout design, equipment manufacturing, sea freight, site installation, commissioning, local training and after-sales support.

Nancheng Turnkey Engineering Scope

Engineering Responsibility

Project Function

Process Configuration

Matches equipment to product requirement

Capacity Coordination

Aligns treatment, blowing and packaging

Plant Layout

Integrates machines with factory space

Utility Definition

Establishes site infrastructure demand

Bottle Handling

Coordinates container transfer

Installation

Converts supplied equipment into an installed system

Commissioning

Verifies connected-line operation

Operator Training

Establishes local operating capability

After-Sales Support

Supports production after handover

The water treatment system, PET bottle blowing machine, automatic water filling machine, labeling machine and packing machine are therefore treated as sections within one engineering project.

This reduces interface ambiguity during layout, installation and commissioning and provides one technical basis for the complete PET bottled water production line.

Technical RFQ Data for a Similar 4,000–5,000 BPH Project

Equipment selection becomes more accurate when the project RFQ contains engineering inputs rather than only a requested filler speed.

Engineering RFQ Checklist

Parameter

Required Project Information

Raw Water

Source and current laboratory analysis

Finished Product

Required bottled-water specification

Primary Bottle

Volume, height, diameter, neck and weight

Additional Bottles

Future SKU dimensions

Production Output

Required BPH

Operating Schedule

Hours per shift and shifts per day

Preform

Weight and neck specification

Cap

Type and neck compatibility

Label

Material, dimensions and application method

Final Pack

Bottle count and pack arrangement

Factory

Dimensions, doors, columns and clear height

Electricity

Voltage, frequency and phase

Existing Air System

Compressor and receiver information

Existing Water Storage

Tank capacities if available

Expansion Plan

Future production or SKU increase

Technical Service

Installation, commissioning and training scope

For a project comparable with the Guinea installation, the confirmed 500 ml bottle, 4,000–5,000 BPH output, raw-water analysis, packaging format and factory conditions provide the starting engineering basis.

Operators working on heat shrink wrapping machine

Production Engineering Summary

The Guinea PET bottled water production line was developed around a 500 ml PET bottle and a designed output of approximately 4,000–5,000 BPH.

That operating range corresponds to approximately 67–83 bottles per minute and a net packaged-water flow of 2.0–2.5 m³/h before treatment losses, sanitation demand and operating allowance are considered.

These values establish a quantitative basis for water treatment, PET bottle supply, filler throughput, conveyor accumulation, labeling and secondary-packaging calculations.

The confirmed plant configuration includes RO water treatment, automatic PET bottle blowing, rinsing-filling-capping, conveying, automatic labeling and heat-shrink wrapping. The project scope also extends through plant layout, installation, commissioning and operator training.

Finished shrink-wrapped bottled water documented at the customer site provides the final available production evidence.

For new projects, Nancheng Machinery can develop the PET bottled water production line from a defined water analysis, bottle specification, target BPH, operating schedule, factory layout, utility conditions and final packaging requirement.

The resulting engineering scope can cover the water treatment system, PET bottle blowing machine, automatic water filling machine, conveying, labeling machine, packing machine, plant layout and commissioning as one coordinated production project.

Engineering evaluation and RFQ preparation should include the raw-water report, bottle drawing, target BPH, production schedule, factory layout, final package specification and destination country.

FAQ: PET Bottled Water Production Line

1. Why shouldn't a PET bottled water line be evaluated as a collection of individual machines?

Because the plant's effective output is determined by the connected system, not by the fastest single machine. An oversized filler cannot compensate for insufficient bottle supply from the blower or insufficient treated water from the RO system, and an unstable labeler or shrink wrapper becomes the downstream bottleneck — it can force the filler to stop even when the filler itself has no fault. For this reason, the line is engineered from the required finished output backward: water treatment, PET blowing, filling, labeling and packaging are all matched around one common production target.

2. What does a turnkey PET bottled-water project actually include?

Beyond machinery supply, the scope covers plant layout design, manufacturing, sea freight shipment, on-site installation and commissioning, operator training and after-sales support. The equipment scope includes an RO water-treatment system, an automatic PET bottle blowing machine, a rinsing–filling–capping monoblock, a bottle conveyor system, an automatic labeling machine and a heat-shrink wrapper. Water-contact components are specified in SUS304 stainless steel, and the configuration is adapted to the local electrical supply and workshop environment.

PET preforms occupy substantially less transport and storage volume than finished empty bottles, so producing bottles inside the factory reduces dependence on long-distance empty-bottle logistics. This benefit comes with additional engineering requirements: compressed-air capacity, electrical load, preform handling, mold access and maintenance space must all be included in the layout and utility design from the start — bottle blowing cannot simply be added as an independent upstream machine.

4. How is line capacity matched across the different production sections?

Capacity planning starts with the required finished output and production schedule. Water treatment is sized on the same capacity basis as filling demand, with treated-water storage acting as a buffer so that short variations upstream do not immediately stop the filler. PET blowing, filling, conveying, labeling and shrink packaging are then matched around the same target. The water balance calculation covers treatment performance, process losses, operational reserve and cleaning-related demand — not just the volume of water inside the bottles.

5. What information should I prepare for a technical quotation?

A useful RFQ defines the project basis: raw-water source and laboratory analysis, finished product type, all planned bottle sizes with bottle drawings, the primary SKU, target output (BPH), production schedule (hours per shift and shifts per day), cap and neck specification, label format, final package (bottles per pack and packaging type), factory drawing with dimensions and clear height, electricity (voltage, frequency and phase), existing utilities (air compressors, tanks), expansion plans, and the required service scope (installation, commissioning, training).

Table of Content list

Ready to Build Your Beverage Plant?

Tell us your capacity, bottle type, and budget – we’ll design a complete solution for you.
PRODUCTS
WHY NANCHENG
CUSTOMER SUPPORT
INFO
+86 18261871098
9 Tongxin Road, Leyu town, Zhangjiagang City, Jiangsu Province, China
© COPYRIGHT 2025 ZHANGJIAGANG NANCHENG MACHINERY CO., LTD. ALL RIGHTS RESERVED.